Gdański Park Naukowo Technologiczny
Reconstruction projects of automation and power systems, and energy redistribution from main facility switchboards.
LOTOS Group
electrical system, automated technology and pneumatics design, to facilitate the development and maintenance of GL movement.
Vistula Spit Canal
Comprehensive project execution: reconstruction of low and medium voltage network, power engineering, CCTV, IT, SWIN, KD and automated technology.
Mazowiecki cable-stayed bridge, Rzeszow
On behalf of the Main Contractor – Bilfinger Infrastructure, Proelectric executed a design for the electrical and power engineering installations of the Rzeszow bridge and the road section. The project also embraced execution of bridge illumination along with a design for LV installation systems, fibre optic systems, IT installations, SWIN and CCTV.
Footbridge o/Motlawa, Gdańsk
Proelectric executed a design for LV, MV power supply installation and secure power supplies (power generators). Moreover, comprehensive execution of engine-driven power supply systems, IT installation, SWIN, CCTV and visualization of electrical and telecom engineering systems.
Mosty Gdańsk Sp. z o. o.
S6 Motorway – execution of power and telecom engineering documentation for the S6 Motorway, at the ‘Kolobrzeg West’ (no interchange) – ‘Ustronie Morskie’ (interchange) section.
CANPOL Babies
Design execution of LV, MV, SAP, DSO, CCTV, IT and access control systems.