CRIST S.A.
Comprehensive delivery of electrical installations associated with the power supply reconstruction of MV station and LV installation. Other works included: pre-fabrication, delivery and installation of LV switchboards; installation of fibre optic cabling; installation of dock and square visualization and lighting control systems; installation of IT cabinets – commissioning and repairs in production halls.
Stocznia Gdańska S.A.
KComprehensive delivery of electrical installation associated with supplying power to existing equipment. Restoration and modernization of lighting and power supply systems. Delivery and installation of < 2000A switchboards – commissioning of receiving installations. Comprehensive delivery of electrical installation within the production hall.
Gdańska Stocznia Remontowa Nauta
Complete renovation of slipway’s electrical installation: removal and installation of brand new switchboard cables on slipways. Lighting modernization in the production hall. Execution of as-build documentation.