Vistula Spit Canal

Comprehensive reconstruction of the medium voltage energy infrastructure, construction of a medium voltage station for construction purposes.

VW Poznan

Electrical and teletechnical works related to the construction of power supply systems due to expansion of the production plant.

Gdański Park Naukowo Technologiczny

Comprehensive energy works within the buildings’ main switchboards scoping automated technology repair, main and emergency power supply control system repair.

Yangtorp, Sweden

For Yangtorp – Swedish Centre of Chinese medicine and resort, Proelectric conducted a comprehensive renovation of electrical system. The project

Read More

Keller, Poland

Works conducted at LOTOS Group SA: reconstruction of energy infrastructure – LV, MV. Telecom and power engineering installations’ collision removal.

Alstal Grupa Budowlana

Design and execution of an electrical and telecom engineering installation at Ełk composting plant.

Kampmann, Poland

Comprehensive installation of electrical power facility, installation of transformer station, prefabrication and launch of switchboards as well as control of

Read More